The weekend after we’d finished our preparations for the stairs we jumped right back into construction site work to build the two foundations with concrete. At the moment the level of the garden lies below the final one, so we needed to work with hollow bricks (you could also work with a cast and fill it with concrete but we thought it would be easier to work with those prefab bricks.)
stiege018
It was a beautiful and sunny day and my brother Schorsch and his girlfriend Tinka gave us a hand mixing the concrete. Luckily, we had a huge concrete mixer on the construction site. It holds about 5 or 6 wheelbarrows of concrete, so it was done pretty fast (“fast” in renovation-language means under 5 hours!).
stiege019 stiege017stiege022stiege015stiege014stiege013
I’m glad Martin is in charge when it comes to all the neat and precise things… I’m just a little to sloppy (and with no patience) about things like that!

stiege023
stiege021
If the weather is good we’ll be mounting the stairs next weekend. Keep my fingers crossed it’s going to be a great weekend!

 

installing the stairs – the prequel

stiege008
We are living with a pretty adventurous entry situation for the last couple of month and although I got used to it pretty fast it still is the most impractical entry situation for a construction site. (you should see us handling tools and heavy stuff up there… also the 3 ACC-blocks which lay in place of the first 2 rungs are quite challenging)
But now it’s time for our new steel stairway to shine! Do you remember we ordered stairs at the trade fair a couple of month ago. It was finally delivered to us weeks ago which led us to the next item on our to-do-list: to built a solid foundation for the staircase.

stiege007
We splitted this activity up to two weekends. On the first we prepared everything for the foundation and on the second we got our hands on mixing concrete.
For mixing concrete you need a serious amount of sand so on the first saturday Martin and I got up really early to go and get some from Martin’s workplace.
(It comes in pretty handy to have such a great partner-in-crime who is able to drive all those big machines. Although he’s behind the computer all day long he enjoys to get back into the drivers seat every once in a while.)
stiege010
stiege006
stiege011
We unloaded the sand at the treehouse site and waited for a friend of my Dads who owns a (supercute) excavator. Tiny but pretty handy when it comes to digging holes for the sewer or the foundation..
stiege005
stiege004
I was supervising the whole digging process from above while Martin and my Dad helped downstairs preparing the hole.
stiege003
stiege002
stiege001
Everything worked out pretty good and at the end of the day we also had a perfectly working sewer. (the last part of the downspout wasn’t installed until now!)
stiege009
We choose a simple galvanized steel staircase with grid stairs (we thought it might be the best idea because with all the wet leafs during fall, wooden stairs could get really slippery and wet leaves freezing onto stairs would be even worst. We hope for the best and that the leafs won’t stick to the steel grid).
Stay tuned for the second day where we cast the foundation.