thermal insulation – the roof – part III

alpor04_13
Ok. so you’ve already seen our insulation bootcamp instuction afternoon and the following days when we catched up with the other side of the roof and prepared everything for the tricky part… finishing the peak.
alpor04_14
alpor3002
We had miss ladybird on the site for two days in a row who gave us a hand! (thank you  my girl!)
alpor3001
I dabbled with the (electric)chainsaw! (thanks Ray for lending it to us! … as soon as we’ve bought a new chain you’ll get it back!) in the meantime miss ladybird was vacuming like a pro with the indusrial vacum cleaner!
I had to leave Martin and miss ladybird for about an hour and when I returned they surprised me with all panels mounted and this little romantic DIY ♥:
alpor04_16
alpor04_09
so cute! thank both of you! ♥
Here is how we filled the peak with the loose material the next day:
alpor04_04
alpor04_02
alpor04_03alpor04_12alpor04_06

Blew the material in (sorry I have no photos of this step because I was in charge of refilling our little pellet-pool and I had to work really fast!)
alpor04_05
alpor04_01
last but not least:
enjoy the view with a cool or warm head (depending on the season) and carry off the bays of your hard work!
You can’t tell a difference from outside but: it’s the things you don’t see that really count! (like everything in life!)
treehouse001

Leave a Reply

Your email address will not be published. Required fields are marked *